The Mituo, Kaohsiung logistics facility started operations in 2010, and was expanded significantly in 2010. The expansion resulted in over 20,000 square meters (or 200,000+ square feet) of factory floor space, containing an automatic warehouse with over 15,000 pallet positions, a large automated optical and roller sorting workshop, automated packaging stations, a quality assurance workshop, and an A2LA accredited (ISO17025 compliant) mechanical testing laboratory.
As currently configured, the Mituo facility is capable of storing, processing and exporting 200 20-ft shipping containers of material each month. All material management, production planning, packaging, warehouse, and quality workflows are fully integrated with JC Grand’s corporate SAP ERP computer system, which ensures accuracy, consistency, and full lot traceability.